IEC 62382:2024 PRV
Pre release version
Control systems in the process industry - Electrical and instrumentation loop check
Abstract
This Final Draft International Standard is an up to 6 weeks' pre-release of the official publication. It is available for sale during its voting period: 2024-04-26 to 2024-06-07. By purchasing this FDIS now, you will automatically receive, in addition, the final publication.
IEC 62382:2024 This document defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the beginning of cold commissioning. This document is applicable for the construction of new plants and for expansion or retrofits (i.e. revamping) of electrical and instrument (E&I) installations in existing plants (including PLC, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). Loop checks can be performed throughout the lifecycle of the plant. This document is also applicable when loop checks are performed after commissioning. This document describes what is intended to be tested but not how the test is performed, due to the wide range of technologies and equipment available.
The intent of this document is to provide a means for all parties, including the owner, the installer and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities described in this document can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment.
IEC 62382:2024 This document defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the beginning of cold commissioning. This document is applicable for the construction of new plants and for expansion or retrofits (i.e. revamping) of electrical and instrument (E&I) installations in existing plants (including PLC, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). Loop checks can be performed throughout the lifecycle of the plant. This document is also applicable when loop checks are performed after commissioning. This document describes what is intended to be tested but not how the test is performed, due to the wide range of technologies and equipment available.
The intent of this document is to provide a means for all parties, including the owner, the installer and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities described in this document can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment.
Additional information
Publication type | International Standard |
---|---|
Publication date | 2024-04-26 |
Edition | 3.0 |
Available language(s) | English |
TC/SC | TC 65/SC 65E - Devices and integration in enterprise systemsrss |
ICS | 25.040.40 - Industrial process measurement and control |
Stability date | 2027 |
Pages | 27 |
File size | 926 KB |
The following test report forms are related:
Share your publications
Learn how to share your publications with your colleagues, using networking options.
Payment information
Our prices are in Swiss francs (CHF). We accept all major credit cards (American Express, Mastercard and Visa, JCB and CUP), PayPal and bank transfers as form of payment.
Keep in touch
Keep up to date with new publication releases and announcements with our free IEC Just Published email newsletter.
Contact customer services
Please send your enquiry by email or call us on +41 22 919 02 11 between 09:00 – 16:00 CET Monday to Friday.