| Reference |
IEC 61334-4-32 ed1.0 withdrawn corrigendum |
 > preview
|
| Title |
Distribution automation using distribution line carrier systems - Part 4: Data communication protocols - Section 32: Data link layer - Logical link control (LLC)
|
| Publication date |
1996-09-26 |
Format, price (Swiss francs) and language |
 | 180.- |
| 69 pages |  | 180.- |
| 869 Kb |
|
| |
| Abstract |
Covers the services required of, or by, the DCP Logical Link
Control (LLC) sublayer entity at the logical interfaces with the
application layer and the MAC sublayer.
This publication is of high relevance for Smart Grid.
|
| Technical Committee |
57 - Power systems management and associated information exchange
|
| ICS Codes |
| 29.240.20 |
Power transmission and distribution lines
|
| 33.200 |
Telecontrol. Telemetering
*Including Supervising, Control and Data Acquisition System (SCADA) |
|
| |
| Replaced by |
|
| Stability date |
2012 |
| |
| Work in progress |
| Project | Stage code | Forecast publication date |
|---|
| No project under development | - | - |
|