| Reference |
IEC 62382 ed2.0 withdrawn corrigendum |
 > preview
|
| Title |
Control systems in the process industry - Electrical and instrumentation loop check
|
| Publication date |
2012-11-08 |
Format, price (Swiss francs) and language |
 | 130.- |
| 42 pages |  | 130.- |
| 1223 Kb |
|
| |
| Abstract |
IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
|
| Technical Committee |
65E - Devices and integration in enterprise systems
|
| ICS Codes |
| 25.040.40 |
Industrial process measurement and control |
|
| |
| Replaced by |
|
| Stability date |
2014 |
| |
| Work in progress |
| Project | Stage code | Forecast publication date |
|---|
| No project under development | - | - |
|