Share by email

IEC 62933-4-3 Pre-release version

IEC 62933-4-3:2025 PRV
Electrical energy storage(EES) systems - Part 4-3: Protection requirements of battery-based energy storage systems (BESS) according to the environmental conditions
This Final Draft International Standard is an up to 6 weeks' pre-release of the official publication. It is available for sale during its voting period: 2025-05-02 to 2025-06-13. By purchasing this FDIS now, you will automatically receive, in addition, the final publication.

IEC 62933-4-3:2025 applies to the effects of the environmental conditions on Battery Energy Storage Systems (BESS). This document addresses these effects and identifies causes, chain of events and final effects on the BESS. Based on those effects, preventative or mitigating measures are described. Typical environmental effects on the BESS include, but are not limited to, the effects of lightning, seismic activities, water, air, flora, fauna, and humans. The described measures focus as a guideline on the entire BESS including all power and communication connections and its Point of Connections (POCs).
The scope of this document is limited to BESS specific requirements and operating conditions. Specific design or safety requirements of individual BESS subsystems are excluded from this document.
PRE-RELEASE VERSION
English
Electronic
  CHF 173.-

Technical committee

TC 120 Electrical Energy Storage (EES) systems

Category

Environment
Publication typeInternational Standard
Publication date2025-05-02
Edition1.0
ICS

13.020.30

27.010

Stability date2031
Pages18
File size425.80 KB
EditionDatePublicationEditionStatus

Related publications