Share by email

IEC 61850-7-410 Consolidated version

IEC 61850-7-410:2012+AMD1:2015 CSV
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.
CONSOLIDATED VERSION
English/French
  CHF 840.-

Technical committee

TC 57 Power systems management and associated information exchange

Keywords

Electricity - Water management - Smart city - LVDC
Publication typeInternational Standard
Publication date2015-11-12
Edition2.1
ICS

33.200

Stability date2026
ISBN number9782832230008
Pages284
File size5.97 MB
EditionDatePublicationEditionStatus

Related publications