IEC 60364-7-711 Redline version
IEC 60364-7-711:2018 RLV
Low-voltage electrical installations - Part 7-711: Requirements for special installations or locations - Exhibitions, shows and stands
IEC 60364-7-711:2018 RLV contains both the official IEC International Standard and its Redline version. The Redline version is available in English only and provides you with a quick and easy way to compare all the changes between the official IEC Standard and its previous edition.
IEC 60364-7-711:2018 gives requirements applying to the temporary electrical installations in exhibitions, shows and stands (including mobile and portable displays and equipment) to protect users. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
a) in 711.3.1 and 711.3.2 addition of "outdoors" to the list of suitable locations;
b) alignment with IEC 60364-4-41.
IEC 60364-7-711:2018 gives requirements applying to the temporary electrical installations in exhibitions, shows and stands (including mobile and portable displays and equipment) to protect users. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
a) in 711.3.1 and 711.3.2 addition of "outdoors" to the list of suitable locations;
b) alignment with IEC 60364-4-41.
CHFÂ 136.-
Technical committee
TC 64 Electrical installations and protection against electric shockKeywords
Rural electrification - LVDCPublication type | International Standard |
Publication date | 2018-03-08 |
Edition | 2.0 |
ICS | 29.020 91.140.50 |
Stability date | 2025 |
ISBN number | 9782832254677 |
Pages | 44 |
File size | 1.26 MB |
Ensure inclusive and equitable quality education
Make cities and human settlements inclusive, safe, resilient and sustainable
Strengthen the means of implementation and revitalize the global partnership for sustainable development