IEC Technical Report 63191 Replaced
IEC TR 63191:2018
Demand side power quality management
IEC TR 63191:2018(E) specifies recommendations about power quality measurement and assessment within installations.
IEC TR 63191:2018 outlines the various phases needed for the establishment of a demand side power quality measurement plan for buildings and industry installations.
Such a power quality measurement plan will enable the optimization of the energy availability and efficiency, improve the assets lifetime and facilitate the resolutions of power quality problems. A power quality measurement plan encompasses the following stages:
• definition of the context, objectives and constraints;
• assessment of the initial power quality situation;
• definition of an action plan for the improvement of the power quality situation;
• implementation of the power quality measuring system;
• exploitation of the measurement system for the improvement of the power quality situation;
• maintenance of the measurement system.
IEC TR 63191:2018 will also help facility managers to tailor their measurement plan to the specific needs of the electrical system under their control. It addresses all the disturbances present in such networks, but does not cover the disturbances present in public electrical distribution networks (supply side) as they are governed by specific documents such as EN 50160 and IEC TS 62749.
IEC TR 63191:2018 outlines the various phases needed for the establishment of a demand side power quality measurement plan for buildings and industry installations.
Such a power quality measurement plan will enable the optimization of the energy availability and efficiency, improve the assets lifetime and facilitate the resolutions of power quality problems. A power quality measurement plan encompasses the following stages:
• definition of the context, objectives and constraints;
• assessment of the initial power quality situation;
• definition of an action plan for the improvement of the power quality situation;
• implementation of the power quality measuring system;
• exploitation of the measurement system for the improvement of the power quality situation;
• maintenance of the measurement system.
IEC TR 63191:2018 will also help facility managers to tailor their measurement plan to the specific needs of the electrical system under their control. It addresses all the disturbances present in such networks, but does not cover the disturbances present in public electrical distribution networks (supply side) as they are governed by specific documents such as EN 50160 and IEC TS 62749.
CHF 345.-
This publication has been replaced by: IEC TS 63191:2023
Technical committee
TC 85 Measuring equipment for electrical and electromagnetic quantitiesCategory
EMCPublication type | Technical Report |
Publication date | 2018-11-23 |
Edition | 1.0 |
ICS | 33.200 |
Stability date | 2023 |
ISBN number | 9782832262573 |
Pages | 79 |
File size | 2.67 MB |
-
Ensure access to affordable, reliable, sustainable and modern energy for all
-
Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation
-
Make cities and human settlements inclusive, safe, resilient and sustainable
-
Ensure sustainable consumption and production patterns
-
Take urgent action to combat climate change and its impacts