IEC 60071-5:2014 Withdrawn

Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations

Note: this publication has been partially replaced by IEC 60071-11:2022 IEC 60071-12:2022

CHF 

Do you need a multi-user copy?

CHF 

Preview

Abstract

IEC 60071-5:2014 provides guidance on the procedures for insulation co-ordination of high-voltage direct current (HVDC) converter stations, without prescribing standardized insulation levels. This standard applies only for HVDC applications in high-voltage a.c. power systems and not for industrial conversion equipment. Principles and guidance given are for insulation co-ordination purposes only. The requirements for human safety are not covered by this standard. This International Standard cancels and replaces IEC TS 60071-5 published in 2002. On the basis of technical experience gained since the Technical Specification was published, sufficient consensus has emerged for transformation of the Technical Specification into an International Standard. The technical content is essentially the same as that contained in the Technical Specification with amendments mainly for user convenience. The structure of the document has been changed to allow division and subdivision into complete integral parts to facilitate comprehension and ease of referencing. In addition to the high level revisions above, the following main technical changes have been made with respect to the previous edition:
- arresters have been added to several locations to reflect some recent 800 kV HVDC scheme practice, along with their justifications, expected voltages, overvoltages and arrester stresses in service;
- significant changes have been made in Clause 8 - all subclauses on the characteristics, schemes, stresses and specification of arresters have been consolidated into a single entity, Clause 8;
- the implications of a smoothing reactor and of a neutral blocking filter located on the neutral bus (as on some recent 800 kV schemes), on coordination of arresters connected to the neutral end have been added;
- possible use of sacrificial arresters on the neutral bus is introduced to cater for excessive arrester energy in the rather unlikely event of a particular rare fault;
- all subclauses dealing with study tools and modelling details have been consolidated into Clause 10;
- creepage distances and clearances have been consolidated into Clauses 11 and 12, respectively, with more details added.

Look inside

Relevant for

rural electrification

LVDC


Additional information

Publication typeInternational Standard
Publication date2014-10-24
Withdrawal date2022-11-08
Edition1.0
Available language(s)English/French, Spanish
TC/SCTC 99 - Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DCrss
ICS29.080.30 - Insulation systems
Stability date  2022
Pages194
File size3075 KB

The following test report forms are related:



Share this page


Share your publications

Learn how to share your publications with your colleagues, using networking options.

Payment information

Our prices are in Swiss francs (CHF). We accept all major credit cards (American Express, Mastercard and Visa, JCB and CUP), PayPal and bank transfers as form of payment.


Keep in touch

Keep up to date with new publication releases and announcements with our free IEC Just Published email newsletter.

Contact customer services

Please send your enquiry by email or call us on +41 22 919 02 11 between 09:00 – 16:00 CET Monday to Friday.