IEC 61968-5:2020 

Application integration at electric utilities - System interfaces for distribution management - Part 5: Distributed energy optimization

English/French
CHF 

Do you need a multi-user copy?

English/French
CHF 

Preview

Abstract

IEC 61968-5:2020 is the description of a set of functions that are needed for enterprise integration of DERMS functions. These exchanges are most likely between a DERMS and a DMS. However, since this is an enterprise integration standard which may leverage IEC 61968-100:2013 for application integration (using web services or JMS) or other loosely-coupled implementations, there are no technical limitations for systems with which a DERMS might exchange information. Also, it should be noted that a DERMS might communicate with individual DER using a variety of standards and protocols such as IEC 61850, IEEE 2030.5, Distribution Network Protocol (DNP), Sunspec Modbus, or perhaps Open Field Message Bus (OpenFMB). One role of the DERMS is to manage this disparity and complexity of communications on the behalf of the system operator. However, the communication to individual DER is out of scope of this standard. Readers should look to those standards to understand communication to individual DER’s smart inverter.
The scope will be limited to the following use case categories:
• DER group creation – a mechanism to manage DER in aggregate
• DER group maintenance – a mechanism to add, remove, or modify the members and/or aggregated capabilities of a given group of DER
• DER group deletion – removing an entire group
• DER group status monitoring – a mechanism for quantifying or ascertaining the current capabilities and/or status of a group of DER
• DER group forecast – a mechanism for predicting the capabilities and/or status of a group of DER for a given time period in the future
• DER group dispatch – a mechanism for requesting that specified capabilities of a group of DER be dispatched to the grid
• DER group voltage ramp rate control – a mechanism for requesting that a DER group following a ramp rate curve
• DER group connect/disconnect – a mechanism to request that DER either isolate themselves, or reconnect to the grid as needed.

Look inside


Additional information

Publication typeInternational Standard
Publication date2020-08-18
Edition1.0
Available language(s)English/French
TC/SCTC 57 - Power systems management and associated information exchangerss
ICS33.200 - Telecontrol. Telemetering
Stability date  2024
Pages99
File size5420 KB

The following test report forms are related:



Share your publications

Learn how to share your publications with your colleagues, using networking options.

Payment information

Our prices are in Swiss francs (CHF). We accept all major credit cards (American Express, Mastercard and Visa, JCB and CUP), PayPal and bank transfers as form of payment.


Keep in touch

Keep up to date with new publication releases and announcements with our free IEC Just Published email newsletter.

Contact customer services

Please send your enquiry by email or call us on +41 22 919 02 11 between 09:00 – 16:00 CET Monday to Friday.