IEC TR 62263:2005 

Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines

English/French
CHF 

Do you need a multi-user copy?

English/French
CHF 

Preview

Abstract

This Technical Report covers procedures for the installation and maintenance of optical fibre cables on overhead power lines. This includes: - optical ground wire (OPGW) fibre cable; - optical phase conductor (OPPC) fibre cable; - optical attached fibre cable (OPAC); - all dielectric self supporting (ADSS) optical fibre cable. Optical fibre cables are considered for single and multi-circuit constructions in common use within some countries. The primary concern is the necessary precautions to ensure the safety of personnel and equipment when installing or maintaining these types of optical fibre cable on overhead power lines.

Look inside


Additional information

Publication typeTechnical Report
Publication date2005-12-13
Edition1.0
Available language(s)English/French
TC/SCTC 78 - Live workingrss
ICS13.260 - Protection against electric shock. Live working
29.240.99 - Other equipment related to power transmission and distribution networks
29.260.99 - Other electrical equipment for working in special conditions
Stability date  2025
Pages89
File size1843 KB

The following test report forms are related:



Share this page


Share your publications

Learn how to share your publications with your colleagues, using networking options.

Payment information

Our prices are in Swiss francs (CHF). We accept all major credit cards (American Express, Mastercard and Visa, JCB and CUP), PayPal and bank transfers as form of payment.


Keep in touch

Keep up to date with new publication releases and announcements with our free IEC Just Published email newsletter.

Contact customer services

Please send your enquiry by email or call us on +41 22 919 02 11 between 09:00 – 16:00 CET Monday to Friday.