Share by email

IEC 61850-7-410

IEC 61850-7-410:2012
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
BASE PUBLICATION
English/French
  CHF 365.-
Consolidated version

The content of amendment(s) is incorporated into the publication. The track changes mode shows where the publication has been modified by the amendment.

Discover

Technical committee

TC 57 Power systems management and associated information exchange

Keywords

Electricity - Water management - Smart city - LVDC
Publication typeInternational Standard
Publication date2012-10-30
Edition2.0
ICS

33.200

Stability date2025
ISBN number9782832204368
Pages122
File size1.91 MB
EditionDatePublicationEditionStatus

Related publications